Showing posts with label Production. Show all posts
Showing posts with label Production. Show all posts

Sunday, June 5, 2011

Steps to be follow

After achieved basic requirement successfully, then the team is move to further works i.e make a bonded garment where 3 segments need to be follow as :
1. Development,
2. Pre-production, and
3. Production.
All those terms are shortly described separately in this blog.